Bordeaux ring road: the Aquitaine bridge closed for two nights from May 14 to 16

By sudouest.fr Bordeaux
Both directions of traffic will be closed between Bordeaux and Lormont
The State regularly carries out maintenance and upkeep work on the Aquitaine Bridge and its surroundings, to guarantee the viability of the structure and the safety of the 110,000 users who use it daily.
These operations require the closure in both directions of traffic of the A630 ring road section between interchange 2 (Lormont - Croix-Rouge) and interchange 4 (Bordeaux - Labarde): from Wednesday May 14 at 9 p.m. to Thursday May 15 at 6 a.m., from Thursday May 15 at 9 p.m. to Friday May 16 at 6 a.m.
The cycle paths on the Aquitaine bridge will also be closed during these periods.
Detours will be in place via the inner and outer ring roads, via the François Mitterrand Bridge, and via the local network. Users are encouraged to be extra vigilant and cautious by respecting the signs, for their own safety and that of those involved.
SudOuest